Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Gutter pan detail.
Splash block cast aluminum model hd5132 ab 78 98 78 98.
The gutter is extended to the roof to form a flashing apron fastened to the roof with cleats at 12 o c.
Tpa 221 through wall scupper isometric tpa 222 gravel stop scupper detail tpa 232 gutter detail tpa 301 parapet wall flashing detail 8 4 9.
Master mark block chocolate gutter down spout splash 2 pack model 32924 20 98 20 98.
Detailed drawings single ply tpa 303 insulated parapet wall flashing detail tpa 304 high parapet wall flashing detail tpa 305 parapet wall flashing detail tpa 310 wall counterflashing detail.
This is an alternate eave detail and is recommended in snow areas when using a gutter.
Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
Denver public works.
Hold your cursor over the file name to view when a drawing was last updated.
The detail drawings are grouped by details and can be downloaded below in dwg or pdf format.
This detail shows a copper gravel stop and a copper gutter supported by straps and brackets.
Install a 1 2 premolded full depth isolation joint the same shape abut existing curb and gutter taper the last two 2 feet of the curb from 6 8.
Curb gutter and sidewalk curb gutter and sidewalk curb gutter and sidewalk curb gutter and sidewalk curb gutter and sidewalk 30 min pan street intersection crosspan approach detail transition to remove crown from street c o lo r a d o of n g m o n t i t y c l public works division date.
Denver public works.
They are loose locked together to allow the gutter to expand and contract independently of the gravel stop.
Form saw or score 1 as the curb and gutter just ahead of the taper.
Set your store to see local availability add to cart.
Denver public works.
The gravel stop is fastened to the roof at its back edge with nails 3 o c.
Copper locking strip is soldered to the apron and engages the end of the copper roof pan.
Denver public works.
Denver public works.
Denver public works.
Install an 18 tie bar across the joint.
Types i 6 i 8 ii 24 gutter pan iii 6 iii 8 ac dike and traffic bars curb type ii 12 gutter pan and gutter transition gutter transition detail sheet not used mountable curb for fire truck access only valley gutter at street intersection type iv 6 and iv 8 deep vertical curb street monument and monument box.
In height to 0.
City engineer april 2017.